Turner Engineering
Home
  • Services
  • Projects
  • About Us
  • Careers
  • Resources
  • Contact Us

East Rochester Central School District 2008 Capital Improvements

East Rochester, New York

Client: Edge Architecture, Allen Rossignol

Project Description: This project entailed renovations and improvements to the District’s K-12 Campus and included extensive site renovations.

Project Type: Educational

Square Footage: N/A

Design Budget: $5,900,000

Engineering Services Provided: HVAC, Plumbing/Fire Protection, Electrical

Completed: October, 2009

Design Challenges…Met

Design of the HVAC, plumbing, electrical and technology infrastructure for renovations throughout the School including renovations of several science rooms, classrooms, locker and shower rooms and the main entry lobby.  Design also included site lighting upgrades and stadium lighting for the football field and tennis courts.

The design including six (6) 75’ stadium light poles with 1500 watt metal halide lamps, achieving an average of 50 foot-candles on the playing field. We designed the technology infrastructure wiring for the installation of smartboards throughout the school and a completely new pool dehumidification system was designed and installed, as well as various energy saving measures.
 

  • Email this page to a colleague
  • Home

© 2008-2010 Turner Engineering PC | 349 West Commercial Street | Suite 2190 | East Rochester, NY 14445 | 585-381-3360

 

  • HOME
  • CONTACT US
  • SITE MAP