Turner Engineering
Home
  • Services
  • Projects
  • About Us
  • Careers
  • Contact Us

Upstate New York Utility Company

Gloversville, New York

Project Description: This project consisted of the design of an integrated control system for a ground water treatment system installed at an Upstate New York utility company site in Gloversville, New York.

Project Type:  Industrial

Square Footage: N/A

Design Budget: N/A

Engineering Services Provided: Industrial Controls

Completed: 2007

Design Challenges…Met

The system controls and monitors various instrumentation and pumps associated with the treatment process. Operator interface graphics were custom designed for this application and the system is controlled via desktop PC located in an adjacent control room. System alarms were configured to automatically dial out to the operators. Turner Integrated Systems provided all aspects of the control system, including design, system logic, graphics and start-up services.

  • Sustainable Design Projects
  • Mission Critical Projects
  • Health Care Projects
  • Educational Projects
  • Municipal Projects
  • Commercial Projects
  • Turner Integrated Systems Projects
  • Home

© 2008 Turner Engineering PC | 349 West Commercial Street | Suite 2190 | East Rochester, NY 14445 | 585-381-3360

 

  • HOME
  • CONTACT US
  • SITE MAP