Time Warner Cable Power Distribution

Rochester, New York

Client: Time Warner Cable, Harry Goldberg

Time Warner Cable Power Distribution 

Project Description: Design of a dual path mission critical power distribution system for an existing data center and television transmission facility.

Project Type: Mission Critical

Design Budget: $3,000,000

Engineering Services Provided: HVAC, Plumbing/Fire Protection, Electrical

Completed: July, 2008

Design Challenges…Met

This project included the design of a new electric service, a 3,200 ampere paralleling switchboard, and capacity for up to (5) 750 kW emergency generators, two sets of two 400 kW paralleled UPS units, and dual path critical power distribution to the existing equipment racks.

  • Email this page to a colleague
  • Sustainable Design Projects
  • Mission Critical Projects
  • Health Care Projects
  • Educational Projects
  • Municipal Projects
  • Commercial Projects
  • Turner Integrated Systems Projects
  • Home

© 2008-2010 Turner Engineering PC | 349 West Commercial Street | Suite 2190 | East Rochester, NY 14445 | 585-381-3360

 

  • HOME
  • CONTACT US
  • SITE MAP